MV RENOVATIONS

Vancouver & the Lower Mainland

Bathroom Renovation in Vancouver

Tile and stone bathrooms built on proper waterproofing, by the tradesman who sets the tile himself.

Request an estimate

Recent work

Bathrooms we have built

Wood-look porcelain and concrete-look tile wet roomBathrooms
Concrete-look porcelain bathroom with wood-grain feature wallBathrooms
White subway tile tub surround with hexagon mosaic nicheBathrooms
Hexagon mosaic recessed niche detailBathrooms
White subway tile with dark grout and inset nicheBathrooms
Stacked white subway tile tub and shower surroundBathrooms
Mitred large-format porcelain niche with metal trimBathrooms
Calacatta-look porcelain slab shower enclosureBathrooms
See all bathroom projects

What we do

Bathroom work we take on

  • Waterproofing

    Full bonded membrane systems, shower pans built by hand

  • Curbless showers

    Recessed structure, linear drains, flush thresholds

  • Large-format porcelain

    Flattened substrates, tight joints, clean cuts

  • Natural stone

    Marble and limestone blended, sealed and protected

  • Niches and benches

    Framed and waterproofed to suit the tile layout

  • Heated floors

    Uncoupling membrane over in-floor heating cable

  • Vanities and fixtures

    Set level and connected by licensed trades

  • Strata coordination

    Insurance, elevator bookings and building work hours

Planning

What drives the cost

No two bathrooms price the same. These are the things that actually move the number, explained the way we would explain them standing in the room with you.

  1. 01

    Footprint and layout changes

    Keeping the toilet, sink and shower where they are is the least expensive path. Moving any of them means opening the floor, re-running drain and supply lines and, in most cases, an inspection.

  2. 02

    Tile size and material

    Porcelain is more forgiving than natural stone: marble and limestone need sealing, careful blending between boxes and slower setting. Large-format sheets need substrate flattening; mosaics need far more cutting time.

  3. 03

    Shower type

    A tub-shower with a standard base is the quickest build. A curbless shower with a linear drain means recessing the floor structure, more waterproofing detail and a sloped pan built by hand.

  4. 04

    Niches, benches and details

    Each niche, bench or bullnose edge is framing, waterproofing and layout work on its own. Two niches and a floating bench add real hours before a single tile goes on.

  5. 05

    Waterproofing system

    We build to a full bonded system (Schluter or equivalent) rather than the minimum. It costs more up front and is the part you never want to redo.

  6. 06

    Who supplies the fixtures

    If you buy the vanity, tile and fixtures yourself, you control that spend and we install. If we supply them, it is one invoice and we carry the warranty and the delivery risk.

  7. 07

    Strata and permit requirements

    Condos usually need building approval, insurance paperwork, elevator bookings and restricted work hours. Plumbing relocations in Vancouver generally need a permit, which adds time before the start date.

Every estimate is itemised so you see exactly where the money goes — request one and we'll walk you through it.

How a project runs

From first message to final walkthrough.

Five steps, and you can see where your job stands at any point.

  1. 01

    Request

    Send the scope, photos and timing in a few minutes.

  2. 02

    Review & photos

    We read it the same day and ask for anything missing.

  3. 03

    Site visit

    Measurements, substrate checks and material talk in person.

  4. 04

    Estimate approved in your portal

    Line-by-line pricing you approve online, no paperwork.

  5. 05

    Build with progress updates

    Photos, milestones and messages as the work moves.

Questions

Common questions

How long does a bathroom renovation take?
A straightforward bathroom in the same layout usually runs three to four weeks on site, including cure and set times we do not rush. Moving plumbing, ordering stone or waiting on a strata approval can push it to six.
Do I need a permit in Vancouver?
Tile, fixtures and finishes in the same layout normally do not need one. Moving drains or supply lines, or changing the room structure, generally does, and we will tell you which side of the line your project sits on before you commit.
Can you work in a strata or condo?
Yes, and we do regularly. We carry the insurance and WorkSafeBC coverage your building will ask for, submit the paperwork, book the elevator and keep to the building's work hours and noise rules.

Ready to start your bathroom?

Send through the room, a few photos and your timing. Matteo reads every request himself and comes back with an itemised estimate.

Request an estimate
CallRequest Estimate